With Phase 1 construction work of the new North Lantau Hospital in
Tung Chung district completed in end 2012, every endeavour was
made to support the commissioning of the eighth hospital in the
Cluster, which will commence service by phases from September
2013.
Personal protec t ive equipment and radiat ion moni tor ing
equipment in the A&E departments of KWC were replaced and
upgraded to meet requirements in the Daya Bay contingency
plan. The sterilisation methods in KWC operating theatres were
also upgraded to align with international standards. The radio
frequency identification system was implemented at the mortuary
of KWH and Lai King Building of PMH in February 2013 and March
2013 respectively for accurate body identification. The Inpatient
Medication Order Entry system was piloted at designated wards of
PMH to enhance medication safety.
年內聯網積極投入新醫院的籌備啟用工作。聯網第
八間醫院北大嶼山醫院第一期興建工程於
2012
底竣工,將於
2013
9
月分階段展開服務。
為配合大亞灣應變計劃,聯網為轄下各急症室更換
及提升個人防護裝備和輻射監測儀器。此外,手術
室器材的消毒方法亦已提升,以符合國際標準。廣
華醫院及瑪嘉烈醫院荔景大樓殮房分別於
2013
2
月及
3
月採用射頻識別系統,為準確識別遺體提供
多一重保障。另外,瑪嘉烈醫院在指定病房試行住
院病人藥物指令系統,提升用藥安全。